Vila Times

VBTC takes full responsibility to repair the running track at Korman Stadium

VBTC takes full responsibility to repair the running track at Korman Stadium
VBTC takes full responsibility to repair the running track at Korman Stadium
Vila Times’s Mobile Application

Vanuatu Broadcasting and Television Corporation (VBTC) that was the main organizer of Kassav’ tour says it is working with a private contractor to repair a small portion (less than 1 square foot) of the running track at Korman Stadium.
While VBTC took all precautions to protect the sports installations during the recent concert, unfortunately, that portion of the track was damaged by a tent pole installed by a local company.
As per VBTC’s agreement with the Vanuatu National Sports Commission, the State owned company has taken full responsibility for the repair works.
With the assistance of our local contractor, material is being flown in from China to repair the track. We expect repair works to be completed within a week or two.

Add comment

error: Content is protected!